Duke Perris Logistics Center II

Perris, California

Overview

LEED Certified building. 36′ clearance under roof structure for racks & storage. Arched canopies & stone veneer at office areas to add beauty to the project. Pop-out tilt-up panels with taller parapets & cornices to concrete tower elements along the building. Cross dock set-up for material handling & shipping needs. Interior Steel Buckling Restrained Braced Frames for superior performance if a seismic event were to occur.

Vulcraft Products Used

Project Specifications

PROJECT COMPLETED: 2016
STEEL FABRICATOR: Duke Pacific, Inc.
ARCHITECT/DESIGNER: Herdman-Rierson Architecture + Design, Inc.
GENERAL CONTRACTOR: Fullmer Construction