The $285 million Fenway Park renovation project included reconstruction of the left and right field suites into 26 open-air private suites with new flooring and seating sections. Vulcraft provided the roof replacement at the Park, which required the installation of composite steel roof deck. Additional renovations included replacing the home plate grandstand concession, new restrooms, a boardroom, and the addition of ADA seating.
June 4-7, 2025
Boston Convention and Exhibition Center
415 Summer Street, Boston, MA 02210
We’ve been hard at work creating solutions that enhance flexibility— and we can’t wait to share them with you at the AIA Conference on Architecture & Design®, Booth 1953.
NEW INNOVATION AT BOOTH 1953